Aquatic Feed Production Line

膨化
September 24, 2025
Category Connection: Aqua Feed Production Line
Brief: Follow along for a hands-on demonstration that highlights performance points of our complete aqua-feed production line. This video showcases the entire process from material receiving to final packaging, featuring advanced extrusion systems, precision grinding technology, and smart automation controls for producing floating and sinking fish pellets.
Related Product Features:
  • Produces floating, sinking, and slow-sinking fish pellets with capacities ranging from 1T/H to 30T/H.
  • Features twin-screw and single-screw extruders for flexible formulation handling of high-fat (6-12%) and high-protein (28-45%) feeds.
  • Includes micro-extrusion systems for fry feed production with particle sizes as small as 0.5-1.2mm.
  • Utilizes ultra-fine grinding technology with adjustable mesh sizes from 40-200 for superior ingredient processing.
  • Incorporates AI-driven process optimization for raw material recognition and energy management.
  • Offers complete turnkey solutions including plant planning, equipment supply, installation, and commissioning services.
  • Features advanced automation with touchscreen controls for real-time parameter adjustment and preset formulas.
  • Includes comprehensive post-processing with oil coating, cooling, screening, and automated packaging systems.
FAQs:
  • What services are included with your aqua-feed production line?
    We provide complete turnkey solutions including plant planning, equipment supply, installation, and commissioning services for your complete production facility.
  • What is the difference between single-screw and twin-screw extruders?
    The choice depends on your specific formula, product type requirements, and budget considerations. Twin-screw extruders offer greater formula flexibility and higher throughput, while single-screw extruders are suitable for specific applications. Contact our sales team for tailored advice.
  • What is the typical delivery time for a complete production line?
    Delivery typically takes 90-120 days, though this may vary depending on the specific project requirements and customization needs.
  • What preparations should buyers make before installation?
    Buyers should prepare civil works, ensure utilities (water, electricity, gas) are available, and have the site ready for equipment installation and commissioning.